Here we will note the improvements that are happening with the Power Market Simulator model and similar models.
Power Market Simulator model
August 1, 2025
- The heuristic solver, which Strategirummet itself developed, has been replaced by HiGHS, which is a mathematical solver developed by MIT. The heuristic solver is still used in a special case where users can follow the calculation process when solving the optimization of production planning
- An option has been added to calculate the prices in the bidding zones flow-based. This calculation is based on the simplification that we assume that the reactances are the same in all transmission connections. You have access to the flow-based calculation in PMS-Education and PMS-Experimental
- Data for production plants and flexible electricity consumption plants for Denmark is no longer based on information from Enerdata, but data is obtained from the Danish Energy Agency
August 1, 2026
- PMS has now been developed so that users can choose between different scenarios before starting the calculation. Each scenario has its own database
- Two different tools have been developed to load scenarios into the PMS database. The two tools are made available to users
- One tool, Add-Units-Technologies, is used to load an expansion plan for the price zones corresponding to the scenario you want to load
- The other tool, PowerPlants-v2, is used to divide existing price zones, insert new ones into the sea and load Excel sheets with data into the PMS database
- The Straterummet's Analysis Group is collaborating with Rambøll to load the TYNDP scenarios: National Trends, National Trends(Low), National Trends(High), Distributed Generation and Global Ambition into the PMS databases. The relevant databases are made available to users